Painters started to refinish kitchen trim today.
 
Exterior doors were stained (from left to right: basement door, kitchen door, front door). Plumbers arrived to start installing plumbing fixtures.
 
 
Color continued to go on the walls. Crown mould started in the kitchen. Outside, the new steps were faced with brick.
 
Attic paint started today. Wood floor will go in once paint is complete.
 
Painters arrived and started on the second floor.
 
Workers completed general clean up over the weekend and put appliances in place
 
First lights were energized today!
 
Heated floor was installed in bathroom. Electricians were in to start install of can lights, switches, and outlets. Rear exterior kitchen door also arrived.
 
We had crown made for the second floor bedrooms to match the crown moulding downstairs. The basement bathroom floor was also grouted into place.