Work continued on regrading the back yard. They had to bring in serveral tri-axle loads for top soil. The front porch bead board started to go up. On the inside the bead board around the banquette continued. In the upstairs bathroom we decided to strip the drawers and door (middle pic on second row) to prepare for repainting 2 done, 4 to go.